Designing a city district with 1.822 homes in Suriname
Summary: In this project we went from just an area-line in GoogleEarth to the creation of a low-level, detailed FTTH network design of the area.
Keywords: FTTH, urban, 1.822 homes, Suriname, micro-ducts, P2P, 2 OF per home, Home=>DP=>POP, optimization, Autocad Map 3D, GoogleEarth, BOQ.
NetOptimus calculated that the best DP size for this area is 24 homes. The calculation is based on cost parameters, trail lengths and home locations. With a approx. 10% spare for future construction, the DP maximum is 22 homes. With a DP size of 24 homes X 2 OF we planned a 48 OF distribution cable from POP to DP. We used a 1×7/4mm micro-duct in the drop-trench from the street to the home. And used 12×7/4mm micro-duct in the streets for the 2 OF drop-cables. For the distribution network we used 7×14/10mm micro-ducts.
The results of this project were:
- Autocad (Map 3D) dwg designs with:
- Optimized manipulation point positions.
- Optimized cable routes (drop & distribution).
- Micro-duct routes.
- Reporting: BOQ and BOM, all quantities and costs.
- For an installer ready design a survey would be required.